Project Background

Manufacturing and office facility upgrade. Vitruvius were brought in to deliver TDK Lambda UK Ltd an efficient, business critical upgrade to the factory and office facilities, providing modernisation to expired old buildings, fabric and utilities infrastructure.

 

The vision

The upgrade will enable staff the flexibility to operate component manufacturing processes and equipment to continue effectively developing and modernising for the future.

With the provision of an additional floor space of about 1480m2 and substantial factory and office facility upgrades, it will support long-term business goals to maintain resilience and sustainability and allow TDK to continue to run its production and manufacturing capability in a competitive global market. This is a campus development that will support TDK’s continued investment and substantial employment in the local area.

 

  • CGI aerial view of TDK Lambda UK Ltd Manufacturing and office facility upgrade project. How the new upgrade will look institute.
  • 3d layout plan
  • 307901-DKA-XX-XX-RP-A-0005-P01-TDK-Presentation_A4Brochure_Page_04_Image_0007.jpg?w=1024&h=646&scale
  • 307901-DKA-XX-XX-RP-A-0005-P01-TDK-Presentation_A4Brochure_Page_04_Image_0005.jpg?w=1024&h=646&scale
  • CGI of internal office upgrade. Kitchen and staff seating areas. Comfortable sofa pods on one side. Comfy green sofa bench with 3 separate tables and chairs.
  • 307901-DKA-XX-XX-RP-A-0005-P01-TDK-Presentation_A4Brochure_Page_09_Image_0004.jpg?w=1024&h=629&scale
  • 307901-DKA-XX-XX-RP-A-0005-P01-TDK-Presentation_A4Brochure_Page_08_Image_0004.jpg?w=1024&h=630&scale

This upgrade will enable staff the flexibility to operate component manufacturing processes and equipment to continue effectively developing and modernise for the future.

Our role in the project

The Vitruvius team are the Project Lead for the TDK Lambda UK Ltd Manufacturing and office facility upgrade project.

Leading the project through the preconstruction phase with project management, commercial management, cost planning, and detailed design of construction phasing. Management and procurement of the best teams to ensure success.  To enable the upgrade of goods areas, manufacturing, plant and office areas to succeed through planning and into construction phasing.

 

The Team:

Vitruvius is proud to have led this project from the preconstruction stage on behalf of our client TDK Lambda UK Ltd, from procuring Architects DKA and achieving planning success.

DKA | Architects in Bath, Somerset

 

 

The Project Details:

The planning proposals represent a well-considered solution that will not negatively nor adversely impact the immediate site context, nor the wider community, but to improve the general amenity of the existing site.
The building requirements involve various complexities, including constraints of the original factory footprint, and addressing level changes and logistical construction phasing of a live operational site.

The works include a wraparound extension incorporating a link building to join two factories of varying floor levels and a mezzanine. Phased planning will be critical to ensure an operational factory during construction, limiting plant and equipment moves. Access routes, storage, noise, ventilation, and the residential neighbourhood were all crucial throughout the design considerations.

 

News article:  Planning Success for TDK Lambda UK

 